Step by step Upgrade cloud control from 13cR1 to 13cR2 (13.2.0.0.0)
Prerequisites for Upgrading to Enterprise Manager Cloud Control 13c Release 2 1.First latest PSU patch needs to be applied in GRID and ORACLE home. In my case latest patch of that time was as below Patch 24412235: GRID INFRASTRUCTURE PATCH SET UPDATE 12.1.0.2.161018 (OCT2016) Prepatch operation log file location: /u01/app/product/12.1.0/grid/cfgtoollogs/crsconfig/hapatch_2016-12-19_01-58-57PM.log… Continue Reading Step by step Upgrade cloud control from 13cR1 to 13cR2 (13.2.0.0.0)